Washington City Utah | (435) 656-6300
111 North 100 East | Washington, Utah 84780 [map]
© 2021 Washington City Corporation. All rights reserved.
Frank Staheli Substation Rebuild
The existing substation is at the end of its useful life. The existing substation will be removed and a new substation will be built at the same location. The new substation will be similar in design as the City’s Sienna Hills and Buena Vista Substations. Initially a single bay will be built with an arrangement for a second bay if in the future it is needed. See attached plan view drawing.
Latest on Instagram: