2019 Slurry Project

The 2019 Slurry Project will consist of 405,000 Yards of type II slurry throughout the city starting the first week of June. Please see maps below for reference of locations. If your area is on the map there will be a flyer handout one week prior and a 24 hour notice to residents of when their street will be done.


Project Information:

45_Slurry Project19.pdf - (pdf 4.25 MB)
46_ Striping Plan .pdf - (pdf 8.18 MB)



Return to Projects


Latest on Instagram:

Washington City Utah | (435) 656-6300
111 North 100 East | Washington, Utah 84780 [map]
© 2019 Washington City Corporation. All rights reserved.

Connect with Washington City: