Merril Road Extension

Project Description:

This project is a new minor arterial road to extend Merrill Road from 20 E to the intersection of Washington Fields Road and Lost Ridge Drive. The road will be a 5-lane facility with curb, gutter, and sidewalk.  Storm drain lines, water lines, sewer lines, and power conduits will be realigned and installed per master planning needs.  

Update: 12-2-19

The project is 75 percent complete with the majority of the utilities installed. We anticipate project completion by the end of December.

Update: 12-24-19

The project is 85 percent complete with all underground utilities installed. The road portion of the project is currently being worked on and should be ready to pave in the next two weeks. Paving will be delayed until warmer temperatures occur.  We anticipate completion sometime in January weather permitting.

Update: 01-21-2020

Asphalt will be completed by the end of this week, sidewalk installation and cleanup will take place next week with an opening of the roadway early February.

Update: 02-13-2020

Merrill Road is now open for public use

Schedule:

Design Completion: May 2019

Construction Start: June 2019

Construction Complete: January 2020


Merrill Road Project Schedule - (pdf 0.21 MB)
Merrill Road TRANSPORTATION EXPO EXHIBIT 2-6-19 - (pdf 5.83 MB)



Return to Projects


Latest on Instagram:

Washington City Utah | (435) 656-6300
letusknow@washingtoncity.org
111 North 100 East | Washington, Utah 84780 [map]
© 2025 Washington City Corporation. All rights reserved.
Privacy Policy

Connect with Washington City: