Sandia Road / 2000 South Road Reconstruct

Project will reconstruct Sandia Road/2000 South from 20 East to Merrill Road. The planned work is for the contractor to remove 17 inches of material from the road, install a woven fabric and then 12 inches of road base, and then five inches of asphalt. Washington City personnel will prep for the contractor by trimming vegetation as needed.

Update 10/1/2024 - At this time the City expects work to begin October 21st (after the reconstruction on 200 South from Washington Fields Rd to 20 E is complete). There will be traffic boards up warning of the start date several days before work begins. The intention (barring unforeseen circumstances) is to keep 2 lanes of travel open, and to keep sidewalks open as well as the school crossing. Work is expected to be completed by the end of the year.





Return to Projects


Latest on Instagram:

Washington City Utah | (435) 656-6300
letusknow@washingtoncity.org
111 North 100 East | Washington, Utah 84780 [map]
© 2024 Washington City Corporation. All rights reserved.
Privacy Policy

Connect with Washington City: