Washington City Utah | (435) 656-6300
111 North 100 East | Washington, Utah 84780 [map]
© 2021 Washington City Corporation. All rights reserved.
MP 11 Interchange Environmental Study
The Utah Department of Transportation (UDOT) is collaborating with Washington City to conduct an environmental impact statement (EIS) that will evaluate transportation needs and develop alternative solutions between Exit 10/Green Spring Drive and Exit 13/Washington Parkway. The study began in summer 2017 and is scheduled to continue for approximately 18-24 months.
Please see the MP 11 website for project information:
Latest on Instagram: