300 East & Telegraph Widening for Right Turn Pocket

This project will consist of roadway construction, traffic signal relocation, new curb and gutter, new concrete sidewalk, privacy wall, landscaping, and signing and road striping. The purpose is to create a right turn lane from 300 East onto Telegraph.

Update 12/02/2024: A preconstruction meeting with the contractor will be held this week to review details. We hope to have an anticipated start date and completion date pinned down at that meeting.