3650 S and Washington Fields Road

Project Information

In Design

5/4/22 Contractor has been selected. Construction will start after traffic signals parts arrive on site.

6/15/22 Concrete bases for the pole have been poured. After the proper curing time the installation of the traffic signal will continue.

7/1/22 The vertical poles and street lights have been installed. The remaining parts will be installed in the next few weeks.

Signal installation is complete.